All Products
-
Bevel Gear Reducer
-
Helical Gear Reducer
-
Cycloidal Gear Reducer
-
Planetary Gear Reducer
-
Worm Gear Reducer
-
Shaft Mounted Speed Reducer
-
Planetary Speed Reducer
-
Cycloidal Speed Reducer
-
Electric Motor Gearbox
-
Liquid Mixer Agitator
-
Industrial Planetary Gearbox
-
Magnetic Lifting Equipment
-
Solid Liquid Separation
-
Industrial Mixer Blades
-
Michale-USAHENGTAI has performed all the responsibilities. Its gearbox operates safely and steadily with lower noisy and good quality. -
Matías Salvati-ArgentinaThe HXG shaft mounted gearbox bought in 2015, it operates steadily, continuous working without faults, has perfect after-sale service. -
Haleem-UAEVery nice products I always buy from HFT, with a very good quality and competitive price, also the salesman in HFT is very nice too.
High Torque Side Entry Agitator gearbox tank agitators industrial
| Packaging Details: | 1PC PACKED STRONG EXPORTING WOODEN CASE WITH PALLETS |
|---|---|
| Delivery Time: | 25-35 days |
| Payment Terms: | T/T or LC |
Helical Gear Heavy Duty Electric Mixer Side Entry for Chemical
| Packaging Details: | 1PC PACKED STRONG EXPORTING WOODEN CASE WITH PALLETS |
|---|---|
| Delivery Time: | 25-35 days |
| Payment Terms: | T/T or LC |
Custom Liquid Mixer Agitator Reducer Mixer for Pushing agitator
| Packaging Details: | 1PC PACKED STRONG EXPORTING WOODEN CASE WITH PALLETS |
|---|---|
| Delivery Time: | 25-35 days |
| Payment Terms: | T/T or LC |
Shaft Mounted Industrial Agitators Mixers Reducer Side Entry
| Packaging Details: | 1PC PACKED STRONG EXPORTING WOODEN CASE WITH PALLETS |
|---|---|
| Delivery Time: | 25-35 days |
| Payment Terms: | T/T or LC |
Metallurgy Helical tank mixers agitators gearbox for Plastic Industry
| Packaging Details: | 1 PC PACED IN STRONG EXPORTING WOODEN CASE WITH PALLETS |
|---|---|
| Delivery Time: | 25-35 days |
| Payment Terms: | T/T or LC |
Mechanical Agitator Side Entry Flange Mounted Cast Iron Helical
| Packaging Details: | 1PC PACKED STRONG EXPORTING WOODEN CASE WITH PALLETS |
|---|---|
| Delivery Time: | 25-35 days |
| Payment Terms: | T/T or LC |
Side Entry Heavy Duty Mixer , Industrial Tank Mixers Agitators
| Packaging Details: | 1PC PACKED STRONG EXPORTING WOODEN CASE WITH PALLETS |
|---|---|
| Delivery Time: | 25-35 days |
| Payment Terms: | T/T or LC |
Laboratory Agitator for Desulfurization , Leaning mounted chemical mixer
| Packaging Details: | 1PC PACED IN STRONG EXPORTING WOODEN CASE WITH PALLETS |
|---|---|
| Delivery Time: | 25-35 days |
| Payment Terms: | T/T or LC |
Heavy Duty Industrial Mixers and Agitators / Tank Mixers Agitators
| Packaging Details: | 1PC PACED IN STRONG EXPORTING WOODEN CASE WITH PALLETS |
|---|---|
| Delivery Time: | 25-35 days |
| Payment Terms: | T/T or LC |
Side Entry Liquid Mixer Agitator Reducer with Shutoff equipment
| Packaging Details: | 1PC PACKED STRONG EXPORTING WOODEN CASE WITH PALLETS |
|---|---|
| Delivery Time: | 25-35 days |
| Payment Terms: | T/T or LC |

